Macky has left for the day and gotten everything accomplished that he was planning to. The tile is in and it looks great. So all he’ll need to do on Monday is grout the floor, install the shower walls and the toilet. We haven’t been able to get the sink cabinet yet so either we’ll install the sink ourselves later or get Macky to do it since he’ll probably be here soon enough doing something else for us.